This is a summary of the inspection performed on the property. It is recommended that the entire report be read.
Exterior and Foundation
9) Safety, Major Defect, Repair/Replace, Evaluate - Cracks, deterioration, leaning and/or bowing were found in retaining walls. Because of the height or proximity to foundations or property lines, a qualified structural engineer should evaluate to determine what repairs are necessary. Repairs should be made by a qualified contractor.
10) Safety, Major Defect, Repair/Replace - Loading docks/ ramps were damaged. Recommend evaluation and securing all loading docs to help ensure safety.
11) Safety, Major Defect, Evaluate - Observed damaged foundation / walls and supports in various areas. Recommend evaluation and repair/replacement to help ensure proper foundation support. Recommend evaluation prior to closing.
Cables used for diagonal bracing were also damaged
12) Safety, Repair/Replace - Vehicle restraint systems were not observed for all but one in the rear of the building. These help to prevent trailers from pulling away unexpectedly. Recommend installing to help prevent loading dock accidents.
https://www.ritehite.com/en/am/products/vehicle-restraints
16) Major Defect, Repair/Replace, Evaluate - Major crack / bowing (more than 3/4 inch wide) was found in the foundation / wall. These appear to be a structural concern, and may indicate that settlement is ongoing. The client(s) are strongly advised to hire qualified contractors and/or engineers as necessary for further evaluation of all areas of foundation. Such contractors may include:
- Foundation repair contractors who may prescribe repairs, and will give cost estimates for prescribed repairs
- Masonry contractors who repair and/or replace brick veneer
- Geotechnical engineers who attempt to determine if settlement is ongoing, and what the cause of the settlement is
- Structural engineers who determine if repairs are necessary, and prescribe those repairs
17) Repair/Replace, Evaluate - Moderate cracking and / or bowing in was found in the foundation/wall. This may be a structural concern, and an indication that settlement is ongoing. The client(s) should consider hiring qualified contractors and/or engineers as necessary for further evaluation of all areas of the foundation. Such contractors may include:
- Foundation repair contractors who may prescribe repairs, and will give cost estimates for prescribed repairs
- Masonry contractors who repair and/or replace brick veneer
- Geotechnical engineers who attempt to determine if settlement is ongoing, and what the cause of the settlement is
- Structural engineers who determine if repairs are necessary, and prescribe those repairs
18) Repair/Replace, Evaluate - There are indications of past foundation repair. However, there are some significant signs of subsequent movement. Recommend a structural engineer and/or drainage specialist be consulted for re-evaluation and/or possible repairs.
19) Repair/Replace, Evaluate - Support columns had dents. Recommend evaluation and repairs if needed.
20) Repair/Replace - The perimeter grading sloped towards the structure in areas. This is a common find. This can result in water accumulating around the structure's foundation, or in basements and crawl spaces if they exist. Accumulated water is a conducive condition to wood destroying insects and organisms. Wet soil may also cause the foundation to settle and possibly fail over time. Recommend grading soil so it slopes down and away from the structure. The grade should drop at least 6 inches within the first 10 feet. Correct any negative slope of brick/concrete areas as well to direct water away from structure.
https://homeinspectionsinohio.com/negative-grading/Where the site does not allow for the necessary fall away from the structure, drains or swales could be used.
21) Repair/Replace - One downspout was dented, damaged and/or crushed. This can restrict the water flow and result in clogging and overflowing gutters. Water may accumulate around the structure's foundation, or in basements and crawl spaces if they exist. Accumulated water is a conducive condition to wood destroying insects and organisms, and may also cause the foundation to settle and possibly fail over time. Damaged downspouts should be repaired or replaced as necessary.
22) Repair/Replace - The cushions to help seal the "connection" between the back of a truck and the structure was missing or significantly deteriorated. Recommend installing.
23) Repair/Replace - One gutter(s) was/were damaged/missing. This can result in water accumulating around the structure's foundation, or in basements and crawl spaces if they exist. Accumulated water is a conducive condition to wood destroying insects and organisms, and may also cause the foundation to settle and possibly fail over time. Recommend replacing or repairing gutters where necessary.
24) Repair/Replace - Bumper designed to protect the dock was missing and deteriorated in area. Recommend installing to help absorb vehicle impacts to protect the docks.
Electric service and Branch Wiring
32) Safety, Repair/Replace, Evaluate - Significant amounts of contaminants or foreign material such as dirt and/or debris were found in the main service panel. No approved method exists for cleaning contaminants from panel interiors or components such as bus or terminal bars. The panel and/or components inside may need replacing. A qualified electrician should evaluate and repair or replace components as necessary.
33) Safety, Repair/Replace, Evaluate - Loose conductors were found in the main service panel had bare ends and were not connected to circuit breakers or fuses. This is a safety hazard due to the risk of fire if the bare conductors come into contact with other components in the panel. An electrician should evaluate and repair as necessary. For example, removing wires that aren't terminated or installing wire nuts.
Panel 2,11,5
34) Safety, Repair/Replace, Evaluate - Neutral wires were doubled or bundled with other conductors on the neutral bus bar in the Panel 12,5. Neutral wires should each have their own terminal and not placed together. This is unsafe due to the need to turn off multiple circuit breakers to work on any of the circuits using these wires. A qualified electrician should evaluate and repair as necessary.
If a neutral wire is bundled with a ground, it is considered a lesser concern and very common for buildings prior to 2002 typically.
35) Safety, Repair/Replace, Evaluate - One open ground, three-pronged grounding type receptacle(s) were found. This is a safety hazard due to the risk of shock. An electrician should evaluate and make repairs as necessary.
Grounding type receptacles were first required in structures during the 1960s. Based on the age of this structure and/or the absence of 2-pronged receptacles, repairs should be made by correcting wiring circuits as necessary so all receptacles are grounded as per standard building practices. Replacement of three-pronged receptacles with 2-pronged receptacles is not an acceptable solution.
36) Safety, Repair/Replace, Evaluate - Two electric receptacle had reverse-polarity wiring, where the hot and neutral wires are reversed. This is a safety hazard due to the risk of shock. An electrician should evaluate and make repairs as necessary.
identified with blue dot(s) with "H&N"
37) Safety, Repair/Replace, Evaluate - At least three sections of wiring that was not terminated was found. This is a potential safety hazard due to the risk of shock. A qualified electrician should evaluate and repair as necessary. For example, cutting the wire to length and terminating the wire with wire nuts in a securely anchored, covered, properly sized junction box.
38) Safety, Repair/Replace, Evaluate - Wire splices were exposed due to not being contained in a covered junction box or in a box that had no cover. This is a safety hazard due to the risk of shock and fire. A qualified electrician should evaluate and make repairs as necessary. For example, install securely mounted junction boxes and/or cover plates where needed to contain wiring splices.
39) Safety, Repair/Replace, Evaluate - Interlocking three single-pole breakers together to create a "3-pole" breaker is generally not considered acceptable practice as it could be an electrical safety hazard and potentially compromise the circuit protection. If one of the "3 pole breakers" circuits were to trip, that one breaker may not be strong enough to trip the other two.
Recommend a qualified licensed electrician install a proper three pole breaker that is designed for that type of 3 phase circuit, and/or removing if not needed any longer.
47) Repair/Replace, Evaluate - Office areas electric receptacle(s) did not have power. Recommend asking the property owner(s) about this. Switches may need to be operated to make some receptacles energized. If necessary, a qualified electrician should evaluate and make repairs as necessary.
identified with blue dot(s)
Heating and cooling
50) Safety, Repair/Replace, Evaluate - The furnace or boiler flame(s) are noisy (roaring) and/or "dancing" over the burner(s). This may be caused by an improper gas-air mixture flow velocity and may result in Carbon Monoxide due to incomplete combustion. A qualified heating and cooling contractor should evaluate and repair as necessary.
51) Repair/Replace, Evaluate - The cooling fins on air handler's evaporator coils are bent, damaged and/or deteriorated. This may result in reduced efficiency and higher energy costs. A qualified heating and cooling contractor should evaluate and repair as necessary.
52) Repair/Replace, Evaluate - One furnace did not respond when its controls were operated. This system was not fully evaluated. The client(s) should consult with the property owner(s) as to how it operates and have a qualified heating and cooling contractor evaluate and make repairs if necessary.
Warehouse and Office Space
67) Repair/Replace, Evaluate - Deteriorated raised concrete floor sections observed. Recommend correction to help remove trip hazards.
Correct any conditions that could lead to settlement.
68) Repair/Replace, Evaluate - Seals between double-pane glass in one window(s) had failed based on condensation or stains between at least one of the panes of glass. A qualified contractor should evaluate entire window and replace glass where necessary.
The client(s) should be aware that evidence of aging seals may be more or less visible from one day to the next depending on the temperature, humidity, sunlight, etc. Windows or glass doors other than those that the inspector identified may also have failed seals and need glass replaced too.
https://homeinspectionsinohio.com/broken-seals
69) Repair/Replace - Active roof leaks were observed recommended repair
70) Repair/Replace - Active roof leaks were observed throughout. Recommended repair
Warehouse rolling doors
76) Repair/Replace - The vehicle doors were damaged or deteriorated. A qualified contractor should evaluate and repair or replace the doors as necessary.
Door D H
Attic/Roof
83) Major Defect, Repair/Replace, Evaluate - The roof surface material is beyond or at the end of its service life and needs replacing now. The client(s) should consult with a qualified roofing contractor to determine replacement options and costs.
84) Repair/Replace, Evaluate - Ventilation was substandard in the attic. Inadequate attic ventilation may result in high attic and roof surface temperatures, reduce the life of the roof covering materials and increase cooling costs. High levels of moisture are also likely, and can be a conducive condition for wood destroying insects and organisms. Standard building practices require one square foot of vent area for 150 to 200 square feet of attic space. Vents should be evenly distributed between soffits, ridges and at corners to promote air circulation. Recommend correction/improvement.
85) Repair/Replace, Evaluate - Standing water was found on the flat roof. It should evaporate within 48 hours after it rains. If standing water remains after 48 hours, then the roof installation is likely substandard. A qualified roofing contractor should evaluate and repair if necessary to prevent prolonged standing water.
86) Repair/Replace, Evaluate - Flashings at parapet walls were deteriorated and/or substandard. These may result in leaks. A qualified roofing contractor should evaluate and repair as necessary.
87) Repair/Replace, Evaluate - Area(s) of the roof structure over the bathrooms was wet or had elevated levels of moisture at the time of the inspection. This indicated an active leak in the roof or structure exterior. A qualified contractor should evaluate and repair as necessary.
88) Repair/Replace, Evaluate - Ceiling insulation above the bathroom was uneven in some areas. The ceiling insulation's R rating was also less than what's recommended for this area (R30). Recommend installing additional insulation as per standard building practices for better energy efficiency.
Older buildings often have R below 13 while recently built buildings have higher R factors of typically 36 to 49 as result of standards changing over time.
We consider R factor of 30 to be the minimum. Adding additional insulation would be considered an upgrade and you should calculate the return on the investment as it will likely take several years to get a return.
89) Repair/Replace, Evaluate - Truss/rafter has been bent/damaged. These should not be altered without a structural engineer approval of the changes. Recommend evaluation and repair.
90) Repair/Replace, Evaluate - Sag/soft areas were located. Recommend evaluation and repair/support as needed.
91) Repair/Replace, Evaluate - Gaps were found in many roof surface seams. These may result in leaks. Recommend evaluation and repair/sealing as necessary.
Areas of previous repairs are in poor condition and should be evaluated for likely replacement.
92) Repair/Replace - Rubber roof had damaged in several areas. Recommend repair/patching to help prevent water infiltration.
93) Repair/Replace - Ventilation cap was missing. Replace or repair the roof as needed.
Commercial Life Safety
99) Safety, Repair/Replace - Fire extinguishers were missing.
Recommend correction.